NoTitleScopeYear
1ROAD MAINTENANCE WORKS
APARTMENT PUTRA SATUm BANDAR SERI PUTRA, KAJANG, SELANGOR
RESURFACING, REPAINTING, AND ADDING FLEXIBLE PLASTIC ROAD FURNITURE2023
2.DRAINAGE MAINTENANCE AND REPAIR
JALAN BAGAN LALANG, PANTAI SEPANG PUTRA, SUNGAI PELEK, SELANGOR
DRAINAGE STRUCTURES, IRRIGATION, AND FLOOD CONTROL (HOPE FLAP GATES) AND RELATED WORKS2023
3RIVER EROSION CONTROL
SUNGAI PALOH, JALAN KLUANG - PALOH, KAMPUNG BARU, KLUANG, JOHOR
MAINTENANCE WORKS TO WIDEN AND DEEPEN THE RIVER2023 - 2024
4RIVER SAND EXTRACTION
RIVER MOUTH OF KELANTAN, MUKIM KUALA BESAR, KELANTAN (IN COLLABORATION WITH ECORE RENO BERHAD)
EXTRACTION, CLEANING, AND RELOCATION OF RIVER SAND2019
5RIVER SAND EXTRACTION
RIVER MOUTH OF KELANTAN, MUKIM SALOR, KELANTAN ( IN COLLABORATION WITH E CORE RENO BERHAD)
EXTRACTION, CLEANING, AND RELOCATION OF RIVER SAND2019
6RIVER SAND EXRACTION
RIVER MOUTH, PASIR MAS, KELANTAN (IN COLLABORATION WITH E CORE RENO BERHAD)
EXTRACTION, CLEANING, AND RELOCATION oF RIVER SAND2020
7DREDGING WORKS
RIVER MOUTH OF SUNGAI MARANG, PULAU KEKABU MARANG, TERENGGANU (IN COLLABORATION WITH: E CORE RENO BERHAD)
FLOOD RISK REDUCTION THROUGH DREDGING2020
8SILICA SAND DREDGING
CHERATING, PAHANG (IN COLLABORATION WITH: E CORE RENO BERHAD)
JOINT VENTURE DREDGING PROJECT2020
9RECLAMATION WORKS
SERI TANJUNG PINANG PENANG (IN COLLABORATION WITH E CORE RENO BERHAD)
PHASE (II) DEVELOPMENT (STP 2)
DREDGING AND DISPOSAL WORKS FROM CHANNEL 2A1-2A2 TO PHASE 2B
2020
10ECRL PASSING LOOP PL03
FELDA LEPAR, PAHANG
CONSTRUCTION, MECHANICAL & ELECTRICAL (M&E) WORKS FOR RAILWAY PASSING LOOP2024 - 2025
11BRIDGE DATA CENTRE III (MY06-B4)
KULAI, JOHOR
MECHANICALAND ELECTRICAL WORK2024 - 2025
12BRIDGE DATA CENTRE III (MY06-B7)
KULAI, JOHOR
MECHANICAL AND ELECTRICAL WORK2024 - 2025
13BRIDGE DATA CENTRES III (MY06-B5)
KULAI, JOHOR
MECHANICAL AND ELECTRICAL WORK2024 - 2025
14BRIDGE DATA CENTRES III (MY06-B5) LIGHTNING PROTECTION
KULAI JOHOR
CONSTRUCTION AND M&E WORKS FOR LIGHTNING PROTECTION & GROUNDING WORKS2024 - 2025
15BRIDGE DATA CENTRES III (MY07)
ULU TIRAM, JOHOR
CONSTRUCTION AND MECHANICAL & M&E WORKS FOR LOW-VOLTAGE SYSTEM2025 - NOW
16SUNWA EQUALBASE MEDINI 103 LOGISTICS CENTRE
MUKIM TANJUNG KUPANG, JOHOR BAHRU
ROADWORKS AND MUNICIPAL PIPELINE CONNECTIONS2025 - NOW
No Title Year
1 TENDER FOR ROAD MAINTENANCE WORKS INCLUDING RESURFACING AND REPAINTING, AS WELL AS ADDING FLEXIBLE PLASTIC ROAD FURNITURE AT APARTMENT PUTRA SATU, BANDAR SERI PUTRA, KAJANG, SELANGOR 2023
2 MAINTENANCE AND REPAIR WORKS OF DRAINAGE STRUCTURES, IRRIGATION, AND FLOOD CONTROL (HDPE FLAP GATES) AND RELATED WORKS AT JALAN BAGAN LALANG, PANTAI SEPANG PUTRA, SUNGAI PELEK, SELANGOR 2023
3 PROPOSAL FOR RIVER EROSION CONTROL AND MAINTENANCE WORKS TO WIDEN AND DEEPEN THE RIVER AT SUNGAI PALOH, JALAN KLUANG - PALOH, KAMPUNG BARU, KLUANG, JOHOR 2023 - 2024
4 EXTRACTION, CLEANING, AND RELOCATION OF RIVER SAND AT THE RIVER MOUTH OF KELANTAN, MUKIM KUALA BESAR, KELANTAN (IN COLLABORATION WITH E CORE RENO BERHAD) 2019
5 EXTRACTION, CLEANING, AND RELOCATION OF RIVER SAND AT THE RIVER MOUTH OF KELANTAN, MUKIM SALOR, KELANTAN (IN COLLABORATION WITH E CORE RENO BERHAD) 2019 - NOW
6 EXTRACTION, CLEANING, AND RELOCATION OF RIVER SAND AT THE RIVER MOUTH, PASIR MAS, KELANTAN (IN COLLABORATION WITH E CORE RENO BERHAD) 2020
7 DREDGING WORKS AT THE RIVER MOUTH OF SUNGAI MARANG, AND OTHER RELATED WORKS TO REDUCE FLOOD RISK - PULAU KEKABU MARANG, TERENGGANU (IN COLLABORATION WITH E CORE RENO BERHAD) 2020
8 JOINT VENTURE DREDGING SILICA SAND PROJECT, CHERATING, PAHANG (IN COLLABORATION WITH E CORE RENO BERHAD) 2020
9 RECLAMATION FOR SERI TANJUNG PINANG PHASE (II) DEVELOPMENT (STP 2) PENANG - DREDGING AND DISPOSAL WORKS FROM CHANNEL 2A1-2A2 TO PHASE 2B (IN COLLABORATION WITH E CORE RENO BERHAD) 2020 - NOW
10 MECHANICAL AND ELECTRICAL WORK FOR THE BRIDGE DATA CENTRE III PROJECT IN KULAI, JOHOR, CONDUCTED IN COLLABORATION WITH CCIE ENGINEERING. 2024 - NOW
11 CONSTRUCTION AND MECHANICAL & ELECTRICAL (M&E) WORKS FOR PASSING LOOP PL03, FELDA LEPAR, PAHANG UNDER THE EAST COAST RAIL LINK (ECRL) PROJECT, IMPLEMENTED IN COLLABORATION WITH CHINA COMMUNICATIONS CONSTRUCTION. 2024 - NOW
12 CONSTRUCTION AND MECHANICAL & ELECTRICAL (M&E) WORKS FOR BRIDGE DATA CENTRES MALAYSIA III – LIGHTNING PROTECTION & GROUNDING WORKS, KULAI, JOHOR, INCLUDING CONSTRUCTION DRAWINGS, WORK PLANS, DESIGN MODIFICATIONS, AND TECHNICAL BRIEFINGS, IMPLEMENTED IN COLLABORATION WITH CCIE ENGINEERING. 2024 - NOW
13 CONSTRUCTION AND MECHANICAL & ELECTRICAL (M&E) WORKS FOR BRIDGE DATA CENTRES MALAYSIA III – LOWVOLTAGE SYSTEM WORKS, ULU TIRAM, JOHOR, INCLUDING DETAILED DRAWINGS, INSTALLATION OF CONTROL BOXES, SWITCHES, PATCH PANELS, COLLECTORS, ACCESS CONTROL SYSTEMS, AND CCTV, AS WELL AS STRUCTURED CABLING, CABLE TRAY INSTALLATION, CABLE ROUTING, CONDUIT INSTALLATION, SUPPORT STRUCTURE INSTALLATION, WALL PENETRATION AND SEALING, CABLE TESTING, SYSTEM COMMISSIONING SUPPORT, MATERIAL HANDLING AND STORAGE, PRODUCT PROTECTION, AND SAFETY COMPLIANCE, IMPLEMENTED IN COLLABORATION WITH CCIE ENGINEERING. 2024 - NOW
14 CONSTRUCTION AND INFRASTRUCTURE WORKS FOR SUNWAY EQUALBASE MEDINI 103 LOGISTICS CENTRE – ROADWORKS AND MUNICIPAL PIPELINE CONNECTIONS, MUKIM TANJUNG KUPANG, JOHOR BAHRU, INCLUDING OUTDOOR ROAD CONSTRUCTION, PIPE NETWORK INSTALLATION, AND CONNECTION TO MUNICIPAL ROAD AND PIPELINE SYSTEMS, IMPLEMENTED IN COLLABORATION WITH CCIE ENGINEERING. 2025 - NOW